Vol. 1 · MondaysAgenda stageNot a bid network

Playground Wire

For dealers who sell the structure, the pour, the pad, and the shade.

SAMPLE — Example brief. Not a live Monday issue. Every item below is labeled SAMPLE.

Vol. 1, No. 1 — the brief as it is meant to look.

A sprayground rebuild in a parks CIP, and a rural elementary that names the structure

SAMPLE issue. The first number is here to show dealers what Monday is for: packets that say playground, splash, shade, or play-area capital while the item is still an agenda line.

SAMPLE

Riverside Park District · meeting Aug 5, 2026

Riverside sprayground listed in the parks CIP as a rebuild, not a patch

Work-session slide 9 shows the Riverside sprayground as 'full rebuild — basin, features, activation' in the 2027–2029 CIP. Staff notes the 2011 system cannot meet current turnover guidance.

No manufacturer is named. No bid date. The CIP chart is public. The purchasing portal is empty.

Stage
Agenda — CIP work session
Source
Park District Board work-session packet, Aug 5, 2026
Kind
Park district agenda (public)
  • splash pad
  • play area capital
SAMPLE

Prairie View School District 19 · meeting Aug 6, 2026

Prairie View Elementary names a structure replacement in the facilities report

The facilities director's monthly report includes Prairie View Elementary: 'recommend replacement of main play structure and accessible route surfacing, target board action in November.'

Enrollment is 186. The existing structure is dated 2003 in the report. That is a rural elementary a regional dealer can actually reach — still months from a posted bid.

Stage
Agenda — facilities report
Source
School Board meeting packet, Aug 6, 2026
Kind
School board agenda (public)
  • play structure
  • surfacing
SAMPLE

East Canyon School District · meeting Aug 4, 2026

Bond workshop slide deck includes 'play area shade' as a category, not a project

A facilities-needs workshop for a possible 2027 bond lists 'play area shade — all elementary sites' as a line under outdoor learning. Dollar figure is a placeholder range.

There are no site plans. There is a public slide that tells a dealer the district is about to spend years talking about shade. The bid, if it comes, is not this year's work.

Stage
Bond workshop
Source
Board bond workshop slides, Aug 4, 2026
Kind
School board workshop (public)
  • shade structure
  • playground

SAMPLE. Compiled as if from packets posted through Sunday. Dated Monday. Not a bid network.

— END WIRE —