Vol. 1 · No. 1
Vol. 1, No. 1 — the brief as it is meant to look.
A sprayground rebuild in a parks CIP, and a rural elementary that names the structure
SAMPLE issue. The first number is here to show dealers what Monday is for: packets that say playground, splash, shade, or play-area capital while the item is still an agenda line.
Riverside Park District · meeting Aug 5, 2026
Riverside sprayground listed in the parks CIP as a rebuild, not a patch
Work-session slide 9 shows the Riverside sprayground as 'full rebuild — basin, features, activation' in the 2027–2029 CIP. Staff notes the 2011 system cannot meet current turnover guidance.
No manufacturer is named. No bid date. The CIP chart is public. The purchasing portal is empty.
Prairie View School District 19 · meeting Aug 6, 2026
Prairie View Elementary names a structure replacement in the facilities report
The facilities director's monthly report includes Prairie View Elementary: 'recommend replacement of main play structure and accessible route surfacing, target board action in November.'
Enrollment is 186. The existing structure is dated 2003 in the report. That is a rural elementary a regional dealer can actually reach — still months from a posted bid.
East Canyon School District · meeting Aug 4, 2026
Bond workshop slide deck includes 'play area shade' as a category, not a project
A facilities-needs workshop for a possible 2027 bond lists 'play area shade — all elementary sites' as a line under outdoor learning. Dollar figure is a placeholder range.
There are no site plans. There is a public slide that tells a dealer the district is about to spend years talking about shade. The bid, if it comes, is not this year's work.
SAMPLE. Compiled as if from packets posted through Sunday. Dated Monday. Not a bid network.
— END WIRE —